TURNKEY SOLUTIONS
END TO END GRID AUGMENTATION
END TO END GRID AUGMENTATION
END TO END GRID AUGMENTATION
System design, application expertise, complete engineering procurement as well as project management, commissioning and lifecycle services
45000+
KMS of OPGW-based communication projects under live line condition (completed or under execution)
120
critical corridors in 27 states
6500+
ckms of uprate and upgrade to existing transmission line (completed or under execution)
100+
Uprate/Upgrade Projects across India
Specialized Engineering, Procurement
and Construction services (EPC)
Our strategic solutions through system design, application expertise, complete engineering procurement as well as project management, commissioning and lifecycle services help customers overcome time, space and capital challenges, ensuring improved performance for transmission and communications systems.

01
Grid Uprate
Boost transmission capacity and reduce losses with advanced high performance conductor for efficient and faster execution for 66KV to 400KV lines.

01
Grid Uprate
Boost transmission capacity and reduce losses with advanced high performance conductor for efficient and faster execution for 66KV to 400KV lines.

01
Grid Uprate
Boost transmission capacity and reduce losses with advanced high performance conductor for efficient and faster execution for 66KV to 400KV lines.

02
Upgrade Solutions
Using existing footprint of the corridor to increase ampacity and load carrying capacity for sustainable grid modernization, backed by a proven track record of working in densely populated areas.

02
Upgrade Solutions
Using existing footprint of the corridor to increase ampacity and load carrying capacity for sustainable grid modernization, backed by a proven track record of working in densely populated areas.

02
Upgrade Solutions
Using existing footprint of the corridor to increase ampacity and load carrying capacity for sustainable grid modernization, backed by a proven track record of working in densely populated areas.

03
Greenfield Transmission EPC
End-to-end EPC for new transmission lines and substations ensuring reliability, scalability, and speed in building resilient power infrastructure.

03
Greenfield Transmission EPC
End-to-end EPC for new transmission lines and substations ensuring reliability, scalability, and speed in building resilient power infrastructure.

03
Greenfield Transmission EPC
End-to-end EPC for new transmission lines and substations ensuring reliability, scalability, and speed in building resilient power infrastructure.

04
Live Line Fibrisation & OPGW
Install OPGW and fibre on live lines with robotic and drone technology for digital grids.

04
Live Line Fibrisation & OPGW
Install OPGW and fibre on live lines with robotic and drone technology for digital grids.

04
Live Line Fibrisation & OPGW
Install OPGW and fibre on live lines with robotic and drone technology for digital grids.

05
Specialized Execution & Tough Terrains
Expert transmission construction in challenging terrains using heli operations and advanced methods for safe, timely project execution.

05
Specialized Execution & Tough Terrains
Expert transmission construction in challenging terrains using heli operations and advanced methods for safe, timely project execution.

05
Specialized Execution & Tough Terrains
Expert transmission construction in challenging terrains using heli operations and advanced methods for safe, timely project execution.

06
Live-Line Reconductoring
Upgrade energized lines with live-line reconductoring for higher capacity, enhanced safety, and zero power disruption.

06
Live-Line Reconductoring
Upgrade energized lines with live-line reconductoring for higher capacity, enhanced safety, and zero power disruption.

06
Live-Line Reconductoring
Upgrade energized lines with live-line reconductoring for higher capacity, enhanced safety, and zero power disruption.
CASE STUDIES
Power in Action
Real projects. Real impact. Proven reliability in every connection.

Crossing the Uncrossable: Rebuilding a 400 kV Line Across the Ganges
Rebuilding a 400 kV line across the river demanded breakthrough conductor design, marine-grade execution, and precision engineering.

Crossing the Uncrossable: Rebuilding a 400 kV Line Across the Ganges
Rebuilding a 400 kV line across the river demanded breakthrough conductor design, marine-grade execution, and precision engineering.

Crossing the Uncrossable: Rebuilding a 400 kV Line Across the Ganges
Rebuilding a 400 kV line across the river demanded breakthrough conductor design, marine-grade execution, and precision engineering.

Drone Stringing for Rail Level Crossings
Sterlite Electric’s MSI team deployed drone-assisted stringing technology to execute conductor installation safely and efficiently, without depending on shutdown windows.

Drone Stringing for Rail Level Crossings
Sterlite Electric’s MSI team deployed drone-assisted stringing technology to execute conductor installation safely and efficiently, without depending on shutdown windows.

Drone Stringing for Rail Level Crossings
Sterlite Electric’s MSI team deployed drone-assisted stringing technology to execute conductor installation safely and efficiently, without depending on shutdown windows.
CLIENTS
Trusted by Industry leaders and Partners




















UP Power Transmission Corporation
"Timely action in supplying materials and executing the work despite several challenges — all while maintaining safety and quality standards."
I convey my sincere thanks to the Sterlite Electric team for their timely action in supplying materials and executing the work despite several challenges during the execution of the Turnkey Contract for Supply, Laying, Testing & Commissioning of 132KV 1C x 1000 Sqmm Cable Laying. The team successfully executed 1.75 ckm route length of 132KV 1C x 1000 Sqmm XLPE Aluminium Cable (total 7.041 km) from Sector 148, Noida to Gantry in Greater Noida, managing expressway and metro crossings, arranging imported joint kits at short notice, and overcoming road-cutting challenges, all while maintaining safety and quality standards.
U.P. Power Transmission Corporation Ltd., Electricity Transmission Division
Tata Power
"Unwavering support in providing materials, manpower, and resources."
We extend a special note of appreciation to Sterlite Electric for their unwavering support in providing materials, manpower, and resources. We sincerely acknowledge the efforts of the team in successfully completing the project under Scheme No. PR/D0000/00149, which involved charging of the new 66kV RG37 Switching Station with the LILO of RG30–RG34 Circuits 1 & 2, covering a route length of 4.3 km. The timely interventions and collaborative efforts ensured the restoration and health of the circuit, thereby securing the integrity of the entire project.
Vivek Narayan
Head – Extra High Voltage Group, Tata Power
Rajasthan Rajya Vidyut Prasaran Nigam Ltd
“Your commitment to safety and your proactive approach to problem-solving were instrumental in achieving this milestone.”
Assistant Engineer (T&C) RRVPNL, PALI, RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD
Rajasthan Rajya Vidyut Prasaran Nigam Ltd
“Exceptional dedication and contribution to the successful completion of the 220 KV S/C Jodhpur (400 KV)- Bilara Transmission Line of CKT KM-81.889, under Project RRVPNL PKG 110.”
Assistant Engineer (T&C) RRVPNL, PALI, RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD
UP Power Transmission Corporation
"Timely action in supplying materials and executing the work despite several challenges — all while maintaining safety and quality standards."
I convey my sincere thanks to the Sterlite Electric team for their timely action in supplying materials and executing the work despite several challenges during the execution of the Turnkey Contract for Supply, Laying, Testing & Commissioning of 132KV 1C x 1000 Sqmm Cable Laying. The team successfully executed 1.75 ckm route length of 132KV 1C x 1000 Sqmm XLPE Aluminium Cable (total 7.041 km) from Sector 148, Noida to Gantry in Greater Noida, managing expressway and metro crossings, arranging imported joint kits at short notice, and overcoming road-cutting challenges, all while maintaining safety and quality standards.
U.P. Power Transmission Corporation Ltd., Electricity Transmission Division
Tata Power
"Unwavering support in providing materials, manpower, and resources."
We extend a special note of appreciation to Sterlite Electric for their unwavering support in providing materials, manpower, and resources. We sincerely acknowledge the efforts of the team in successfully completing the project under Scheme No. PR/D0000/00149, which involved charging of the new 66kV RG37 Switching Station with the LILO of RG30–RG34 Circuits 1 & 2, covering a route length of 4.3 km. The timely interventions and collaborative efforts ensured the restoration and health of the circuit, thereby securing the integrity of the entire project.
Vivek Narayan
Head – Extra High Voltage Group, Tata Power
Rajasthan Rajya Vidyut Prasaran Nigam Ltd
“Your commitment to safety and your proactive approach to problem-solving were instrumental in achieving this milestone.”
Assistant Engineer (T&C) RRVPNL, PALI, RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD
Rajasthan Rajya Vidyut Prasaran Nigam Ltd
“Exceptional dedication and contribution to the successful completion of the 220 KV S/C Jodhpur (400 KV)- Bilara Transmission Line of CKT KM-81.889, under Project RRVPNL PKG 110.”
Assistant Engineer (T&C) RRVPNL, PALI, RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD
UP Power Transmission Corporation
"Timely action in supplying materials and executing the work despite several challenges — all while maintaining safety and quality standards."
I convey my sincere thanks to the Sterlite Electric team for their timely action in supplying materials and executing the work despite several challenges during the execution of the Turnkey Contract for Supply, Laying, Testing & Commissioning of 132KV 1C x 1000 Sqmm Cable Laying. The team successfully executed 1.75 ckm route length of 132KV 1C x 1000 Sqmm XLPE Aluminium Cable (total 7.041 km) from Sector 148, Noida to Gantry in Greater Noida, managing expressway and metro crossings, arranging imported joint kits at short notice, and overcoming road-cutting challenges, all while maintaining safety and quality standards.
U.P. Power Transmission Corporation Ltd., Electricity Transmission Division
Tata Power
"Unwavering support in providing materials, manpower, and resources."
We extend a special note of appreciation to Sterlite Electric for their unwavering support in providing materials, manpower, and resources. We sincerely acknowledge the efforts of the team in successfully completing the project under Scheme No. PR/D0000/00149, which involved charging of the new 66kV RG37 Switching Station with the LILO of RG30–RG34 Circuits 1 & 2, covering a route length of 4.3 km. The timely interventions and collaborative efforts ensured the restoration and health of the circuit, thereby securing the integrity of the entire project.
Vivek Narayan
Head – Extra High Voltage Group, Tata Power
Rajasthan Rajya Vidyut Prasaran Nigam Ltd
“Your commitment to safety and your proactive approach to problem-solving were instrumental in achieving this milestone.”
Assistant Engineer (T&C) RRVPNL, PALI, RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD
Rajasthan Rajya Vidyut Prasaran Nigam Ltd
“Exceptional dedication and contribution to the successful completion of the 220 KV S/C Jodhpur (400 KV)- Bilara Transmission Line of CKT KM-81.889, under Project RRVPNL PKG 110.”
Assistant Engineer (T&C) RRVPNL, PALI, RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD
UP Power Transmission Corporation
"Timely action in supplying materials and executing the work despite several challenges — all while maintaining safety and quality standards."
I convey my sincere thanks to the Sterlite Electric team for their timely action in supplying materials and executing the work despite several challenges during the execution of the Turnkey Contract for Supply, Laying, Testing & Commissioning of 132KV 1C x 1000 Sqmm Cable Laying. The team successfully executed 1.75 ckm route length of 132KV 1C x 1000 Sqmm XLPE Aluminium Cable (total 7.041 km) from Sector 148, Noida to Gantry in Greater Noida, managing expressway and metro crossings, arranging imported joint kits at short notice, and overcoming road-cutting challenges, all while maintaining safety and quality standards.
U.P. Power Transmission Corporation Ltd., Electricity Transmission Division
Tata Power
"Unwavering support in providing materials, manpower, and resources."
We extend a special note of appreciation to Sterlite Electric for their unwavering support in providing materials, manpower, and resources. We sincerely acknowledge the efforts of the team in successfully completing the project under Scheme No. PR/D0000/00149, which involved charging of the new 66kV RG37 Switching Station with the LILO of RG30–RG34 Circuits 1 & 2, covering a route length of 4.3 km. The timely interventions and collaborative efforts ensured the restoration and health of the circuit, thereby securing the integrity of the entire project.
Vivek Narayan
Head – Extra High Voltage Group, Tata Power
Rajasthan Rajya Vidyut Prasaran Nigam Ltd
“Your commitment to safety and your proactive approach to problem-solving were instrumental in achieving this milestone.”
Assistant Engineer (T&C) RRVPNL, PALI, RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD
Rajasthan Rajya Vidyut Prasaran Nigam Ltd
“Exceptional dedication and contribution to the successful completion of the 220 KV S/C Jodhpur (400 KV)- Bilara Transmission Line of CKT KM-81.889, under Project RRVPNL PKG 110.”
Assistant Engineer (T&C) RRVPNL, PALI, RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD
You may also be interested in
You may also be interested in
You may also be interested in
Empowering humanity by addressing the toughest challenges of clean energy delivery
Designed and Developed by Figure&Plot
Empowering humanity by addressing the toughest challenges of clean energy delivery
Designed and Developed by Figure&Plot
Empowering humanity by addressing the toughest challenges of clean energy delivery
Designed and Developed by Figure&Plot