Building Resilient Power Networks for Critical Institutions

Sterlite Electric reimagined the city’s power backbone with underground networks and GIS technology, ensuring uninterrupted power for vital healthcare and governance hubs—powering people, not just grids.

Project: 132/33 kV, 2×50 MVA GIS Substation at SMS Hospital, Jaipur. This included associated transmission lines, underground HV cable systems, and terminal bays

When Jaipur’s two most critical institutions, Rajasthan Vidhan Sabha and SMS Hospital faced frequent power risks, the city needed more than a technical fix. It needed a resilient grid built for reliability and safety. Sterlite Electric built a network that made the city's critical power supply unbreakable.

Challenge: Fragile Power Line

In the heart of the city, the SMS Stadium substation powered key civic and healthcare zones but was depended on just two external feeders with no internal redundancy. 

That meant any fault could disrupt power to:

  • The Vidhan Sabha, Jaipur’s legislative nerve centre

  • The SMS Stadium and adjoining residential clusters

  • And most critically, the SMS Hospital, where the new IPD Tower required an uninterrupted, high-load power supply for patient care

Further, spatial limitations and an absolute ban on overhead infrastructure added more complexity to the challenge. As the city’s healthcare and governance demand surged, ensuring reliable, round-the-clock power became a strategic imperative.

Solution: Reimagining Jaipur’s Intracity Power Network

Working with Rajasthan Rajya Vidyut Prasaran Nigam Limited (RRVPNL), we delivered a comprehensive intra-city grid modernization transforming it into a future-ready, resilient grid through strategic underground infrastructure.

Our key interventions

  • New Intra-City Power Link: Built a high-capacity underground power link between SMS Stadium, SMS Hospital, and Jawahar Nagar, creating a 3-node network that reduced dependency and improved flexibility.

  • Capacity Upgrade: Enhanced transmission capacity from 630A to 1200A, ensuring continuous power for critical healthcare infrastructure.

  • Dedicated GIS Substation: Constructed within SMS Hospital to directly support the new IPD Tower’s energy demand.

  • Stakeholder Alignment & Coordination: Coordinated seamlessly with SMS Medical College, urban authorities, and local representatives to enable smooth disruption free execution in a complex environment.

  • Smart City Integration: Shifted all power flow to underground cabling, improving reliability while maintaining Jaipur’s visual and environmental aesthetics.

The Impact

This strategic upgrade didn’t just power a hospital. It fortified Jaipur’s civic and healthcare backbone.

Transformation

Impact

Header 3

2 feeders → 3-node interconnected network

Eliminated single-point failure and improved redundancy

Cell 1-3

Load upgraded from 630A → 1200A

Doubled power capacity for expansion

Cell 2-3

Underground HV cabling

Safer, sustainable, and Smart City compliant


Dedicated GIS Substation

24×7 power for SMS Hospital IPD Tower


Multi-stakeholder coordination

Seamless execution in a sensitive zone


The project was featured across regional news outlets and print media for its contribution to Jaipur’s grid resilience and Smart City journey.

<Coverage Snapshot>

This project exemplifies how strategic engineering and collaborative execution can transform a city’s infrastructure backbone enabling growth, resilience, and sustainability in one of India’s fastest-evolving urban hubs. By delivering reliability where it matters most, that is the healthcare, governance, and community wellbeing, we’re not just powering Jaipur. We’re powering trust in the city’s future.

Empowering humanity by addressing the toughest challenges of clean energy delivery

Sterlite Electric Logo

get updates

follow us

LinkedIn
X.com
YouTube
Instagram
Facebook

Empowering humanity by addressing the toughest challenges of clean energy delivery

Sterlite Electric Logo

get updates

follow us

LinkedIn
X.com
YouTube
Instagram
Facebook

Empowering humanity by addressing the toughest challenges of clean energy delivery

Sterlite Electric Logo

get updates

follow us

LinkedIn
X.com
YouTube
Instagram
Facebook